How to Choose a Fence Company in Dallas: The Questions That Actually Matter

Bids that look identical rarely are. The specification questions that separate a 20-year fence from a 7-year fence.

Estate gate installation
Estate gate installation. Photo: Park Cities Fence & Deck.

In short

Judge a fence company on specifics, not adjectives: how posts are set, what fasteners and lumber grade are quoted, whether the timeline and scope are in writing, who handles permits and locates, and whether someone walks the finished fence with you. Two bids that look identical on price can be years apart in lifespan.

In this guide

  1. Start underground: how are the posts set?
  2. Fasteners and hardware: the cheapest place to cut corners
  3. Materials grade: cedar is not one thing
  4. Scope, timeline and paperwork in writing
  5. Reviews, references and how the company communicates
  6. The final walkthrough: who stands behind the work?
  7. The checklist, condensed

Need this done? See wood fencing.

Every fence bid promises quality, and most of them look alike: a price, a length, the word cedar somewhere. But the difference between a fence that fails in seven years and one that stands for twenty lives in details that many quotes never mention. The buyer who asks about those details gets a better fence from whichever company they hire.

This is the checklist we would use if we were hiring a fence company ourselves, not a list of red flags about other builders, but the specification questions that let you compare bids on substance. There are excellent contractors across DFW; the point is to make any of them show you exactly what you are buying.

Start underground: how are the posts set?

Fences almost never fail at the pickets, they fail at the posts and the fasteners. So the first question for any bidder is the one the eye cannot check later: how deep are the post holes, and what goes in them? Posts belong in concrete, sized and set for North Texas clay that swells and shrinks with every wet-dry cycle.

Ask whether steel posts are an option. Wood posts are traditional and can serve well, but steel posts set in concrete remove the single most common failure point, the post rotting at the ground line while the rest of the fence is still sound. A bid that specifies post material, hole depth and concrete tells you the company thinks about year fifteen, not just installation day.

Listen to how the answer is delivered as much as what it says. A builder who explains why the clay here demands what it demands, and who volunteers the trade-offs between wood and steel posts without being pushed, is showing you how the whole project will go. Confident specifics are the tell; a shrug and a price are the other tell.

Fasteners and hardware: the cheapest place to cut corners

Fastener choice is invisible in a bid and very visible five years later. Plain steel fasteners react with the natural oils in cedar, weeping black streaks down every picket and eventually rusting loose. Galvanized fasteners cost slightly more and do neither. Ask every bidder, in writing, what they use.

The same scrutiny applies to gate hardware, hinges and latches carry more load than any other part of the fence and are the first thing to sag on a cut-rate build. On automated gates, ask what the operator package includes; safety photo-eyes and battery backup should be part of the answer, as they are on our automatic gate installations.

  • Galvanized fasteners: Prevent the black streaking and rust that plain fasteners cause in cedar.
  • Gate hardware rated for the weight: Undersized hinges are why gates drag within a couple of seasons.
  • It should be in the quote: If a bid does not name its fasteners and hardware, ask until it does.

Materials grade: cedar is not one thing

Two quotes can both say cedar and describe very different lumber. Grade determines how many knots, how much wane and how straight the boards run; drying matters just as much, because kiln-dried cedar has already done its shrinking before it is nailed up. Green lumber shrinks on your fence line, opening gaps and splitting at fasteners.

Ask each company what grade of picket they quote, whether the lumber is kiln-dried, and what the rails and rot boards are made of. Then ask to see it, a company proud of its material will happily show you a recent build. Our wood fencing spec is kiln-dried cedar as standard, and we would rather explain lumber for ten minutes than have you compare bids blind.

Horizontal cedar fence on a cut-stone base
Horizontal cedar fence on a cut-stone base. Photo: Park Cities Fence & Deck.

Scope, timeline and paperwork in writing

A trustworthy quote reads like a plan, not a number. It should state the exact footage and gate count, the construction style, tear-out and haul-off of the old fence, and who is responsible for permits, HOA submission and the 811 utility locate. Those paperwork items are part of the job; a bid that leaves them unmentioned is quietly leaving them to you.

Timeline expectations deserve the same clarity. Most wood fences are built in one to three days once materials and approvals are in hand, so what you really want from a bidder is a realistic start window and a commitment to communicate if it moves. Vague timelines produce the classic fence-project misery: a torn-out fence, an open yard and an unreachable contractor.

  • Exact footage and gates: The scope should read from a measurement, not an estimate over the phone.
  • Tear-out and haul-off: Removing and disposing of the old fence should be stated, not assumed.
  • Paperwork ownership: Permit, HOA submission and the 811 locate, the quote should name who files each.
  • Start window and duration: A realistic window beats an optimistic date that quietly slides.

Reviews, references and how the company communicates

Read reviews for patterns rather than scores. A handful of detailed reviews describing how a company handled a problem tells you more than a wall of five-star one-liners, every established contractor eventually faces a delay or a surprise underground, and the reviews reveal who fixes things and who disappears. Recency matters too; crews change.

Then notice how the company treats you before any money changes hands. Are questions answered directly? Does the quote arrive when promised? At Park Cities Fence & Deck, a free quote usually comes back within 24 hours, and we hold a 5.0 Google rating, but whoever you talk to, the pre-sale experience is an honest preview of the build experience. Responsiveness is a specification, too.

References still beat everything for larger projects. For an estate frontage or an automated gate, ask to see a comparable completed job, not a photo, an address you can drive past. A company that builds well in your area can name streets. Ours are all over the Park Cities and Preston Hollow, and we are happy to point you to work that has been standing through a few Texas summers.

The final walkthrough: who stands behind the work?

Ask every bidder one closing question: who inspects the finished fence, and will they walk it with me? A final walkthrough, gates cycled, lines sighted, caps checked, site cleaned, is where small punch-list items get fixed while the crew is still mobilized instead of six months later. A company that schedules it as standard is telling you something about its culture.

Here, that walkthrough is done by the owner. Jack walks every completed build with the homeowner, usually with his dog Cinco supervising, before we consider the job finished. Whatever company you choose, insist on the walkthrough. It costs nothing and it is the single best quality-control step a buyer can demand. When you are ready to compare bids, we would be glad to be one of them.

New stained cedar privacy fence across a Dallas backyard
New stained cedar privacy fence across a Dallas backyard. Photo: Park Cities Fence & Deck.

The checklist, condensed

Print this, and ask every company the same seven things: post material, depth and concrete; fastener type; lumber grade and drying; exact written scope including tear-out; who files permits, HOA drawings and 811 locates; a realistic start window and build duration; and who performs the final walkthrough. Then compare the answers side by side.

Priced-alike bids separate fast under those questions, and the comparison usually reveals that the cheapest bid and the best value are different bids. A fence is a fifteen-to-twenty-year purchase in this climate, cedar lasts 15–20 years here when it is built and maintained right, so an hour of diligence up front is the best-paying hour of the whole project. Our FAQ answers the most common versions of these questions the way we answer them in person.

How Park Cities Fence & Deck helps

Jack Johnson comes out himself, looks at your property and gives you a free written estimate with a timeline. Wood, iron and masonry are all built in-house, so the advice fits the property. Related services: wood fencing, gates & gate motors, fence rehab / repair. We work in Dallas and Plano and across Dallas.

Call (214) 755-8100

Questions people ask next

What is the most important question to ask a fence company?

Ask how the posts are set, material, hole depth and concrete. Posts are the most common failure point in North Texas clay, and the answer instantly reveals whether a company builds for the long term. Steel posts set in concrete are the strongest common option, and a good bidder will explain the trade-offs plainly.

How many fence bids should I get?

Two or three is usually enough, the goal is comparison, not volume. Give every company the same scope, then compare specifications rather than just totals: posts, fasteners, lumber grade, tear-out, paperwork and timeline. Identical prices with different specs are not identical bids, and the differences show up in years, not weeks.

Should the fence company handle permits and the 811 call?

Yes. Permits, HOA submissions and utility locates are part of building a fence properly, and an established contractor treats them as included work. Ask each bidder directly who files what. We handle permits, HOA drawings and 811 locates on every installation, and any quote you receive should say who does.

How long should a new wood fence take to build?

Most wood fences go up in one to three days once materials and any approvals are in hand. The longer runway, when there is one, is paperwork, HOA committees and permit review. What matters most in a bid is a realistic start window and a company that communicates when anything shifts.

What should happen at the end of a fence project?

A final walkthrough: gates cycled, fence lines sighted for straightness, hardware and caps checked, and the site cleaned on both sides. Punch-list items get fixed on the spot. At Park Cities Fence & Deck the owner, Jack, walks every finished build with the homeowner before the job is closed out.