What Should a Fence Quote and Contract in Dallas Include?
A good fence quote names the wood, the posts, the gates, the paperwork, the dates and the payment terms in writing.

In short
A complete fence quote names the exact materials, post type and depth, height and style, every gate and its hardware, tear-out and haul-off, who handles permits, HOA drawings and 811, the start and finish window, the payment schedule, how changes are approved, and the warranty terms. If it is not written down, it is not included.
In this guide
- What should the materials section spell out?
- What should it say about posts, footings and height?
- How do you compare a vague quote with a complete one?
- What details should be listed for gates?
- Who handles permits, HOA approval and 811?
- What should the schedule and payment terms look like?
- How should changes and surprises be handled?
- What should the warranty and closeout section say?
Need this done? See wood fencing.
Two fence quotes for the same yard can differ widely and both be honest. One includes steel posts, a cap and trim, a kickboard, haul-off and the permit. The other is a one-line total for a cedar fence. You cannot compare them until both are written to the same level of detail.
This checklist shows what belongs on the page, why each item matters and what to do when it is missing. It is general information, not legal advice. For how to judge the company behind the quote, see how to choose a fence company in Dallas.
What should the materials section spell out?
Species, grade and dimensions. The words cedar fence cover a wide range. A good quote says Western Red Cedar, redwood or pressure-treated pine, gives the picket thickness and width, and names the style: board-on-board, side-by-side, board-and-batten, shadowbox or horizontal. It lists the cap, trim and kickboard if they are included. Our guide to what drives cedar fence cost explains why each of those lines moves the total.
For metal, look for the material (wrought iron, ornamental steel or aluminum), picket and rail sizes, and the finish. A powder-coated finish should be stated as such. For brick and stone, the quote should describe the footing, the reinforcement and how the masonry will be matched to the house. See custom iron fence cost factors for the metal side.
Fasteners and stain are easy to overlook. Galvanized or coated fasteners resist the black streaks that cheap nails leave on cedar. If staining is part of the job, the quote should name the product type and color and say whether both sides are covered.
What should it say about posts, footings and height?
The posts decide how long the fence stands straight, and they are the part you will never see again. The quote should state the post material (steel or wood), the size, the spacing, and that posts are set in concrete. It should give the hole depth, because North Texas clay swells and shrinks with the seasons and shallow posts lean.
Height should be written as a number and tied to the rules. A fence that is taller than the city or the HOA allows is the contractor’s drawing error on paper and your problem on the ground. The quote should say who confirmed the allowed height. For background, see fence height rules in Dallas and the Park Cities.
Where the grade changes, ask how the fence will follow it: stepped panels or a top line that tracks the slope, and how the gap at the bottom will be handled. On a yard with drainage swales, the answer affects both looks and function.
How do you compare a vague quote with a complete one?
Line the quotes up against the same list. Where one is silent, ask the company to write its answer into a revised quote before you compare totals. The table shows what the difference looks like in practice.
A vague fence quote vs. a complete one
| Item | Vague quote | Complete quote |
|---|---|---|
| Wood | Cedar privacy fence | Species, picket size, style, cap, trim and kickboard listed |
| Posts | Not mentioned | Material, size, spacing, depth and concrete stated |
| Gates | Includes gate | Count, width, frame, hinges, latch and any operator listed |
| Removal | Not mentioned | Tear-out, old footings and haul-off included or priced |
| Paperwork | Owner to obtain permit | Contractor handles permit, HOA drawings and 811 |
| Payment | Total due | Deposit, progress and final payment tied to stages of work |
What this means for you: The lower total is only the better deal if both quotes describe the same fence.

What details should be listed for gates?
Gates are the moving parts and the first thing to fail when they are under-built. For each walk gate the quote should give the width, the frame construction, the hinges and the latch. A wide wood gate without a rigid frame will sag, and the fix is never as good as building it right.
For a driveway gate, expect a section of its own: swing or slide, the gate material, the operator, keypads and remotes, safety sensors, and who supplies power to the operator. Electrical work is often a separate trade, and the quote should say so plainly. Our articles on automatic gate cost factors and driveway gate security features list what to look for, and the automatic gates page shows what we install.
Who handles permits, HOA approval and 811?
The contract should name the responsible party for each one. The Federal Trade Commission lists a contractor who asks you to get the building permits yourself among the warning signs of a home improvement scam. An established fence company pulls the permit, prepares the HOA drawings and files the utility locate.
On utilities, the Railroad Commission of Texas states that anyone planning to dig deeper than 16 inches is required by Texas law to call 811. Fence posts qualify. The contract should also say how private lines such as sprinklers and landscape lighting will be identified and what happens if one is damaged. Our guide to protecting landscaping during installation covers that conversation.
In Highland Park and University Park the review is its own step with its own lead time. See Highland Park and University Park fence permits. The schedule in the contract should account for it.
What should the schedule and payment terms look like?
The FTC advises that a written contract include an estimated start and completion date. For a fence, a start window and a duration are realistic, with a note on what can move them: weather, material lead times, permit and HOA approvals. Most wood fences are built in one to three days once work begins. Masonry and automated gates run longer.
On money, the FTC’s guidance is direct: do not pay the full amount up front, be wary of anyone who accepts only cash, and never make the final payment until the work is done and you are satisfied with it. A reasonable schedule ties payments to stages, such as a deposit to order materials and the balance after the final walkthrough.
The contract should carry the contractor’s name, address and phone number, and any verbal promise should be written in. The FTC also recommends filling in every blank and, for contracts signed at your home, getting the written statement of your right to cancel. Ask for proof of insurance and keep a copy with the contract.
How should changes and surprises be handled?
Fences meet surprises underground: rock, old footings, roots, an unmarked pipe. The contract should say what happens then. A written change order with the added work and its price, approved by you before the work continues, protects both sides. A verbal agreement at the fence line is how disputes start.
It should also state who owns the decision when a post has to move, a tree is in the way or the neighbor’s side needs access. On shared lines, read shared fences in Texas before signing, because a fence on the wrong side of the line is the costliest surprise of all. A survey settles it.
Ask as well how the yard will be left if work pauses for weather or an inspection. Open post holes, a missing section of fence beside a pool and loose materials are all things the contract can address in a sentence.

What should the warranty and closeout section say?
Look for two separate things: the builder’s workmanship coverage and the manufacturer warranties on materials such as gate operators, powder-coated panels and composite boards. The contract should state the terms in writing, including what is excluded. Natural movement in wood, such as minor checking and color change, is normally not a defect. Our guide to fence and gate warranties explains what is typical.
Closeout should be written in too: cleanup, haul-off, gate adjustment, a demonstration of the gate operator, and a walkthrough with the owner before final payment. At Park Cities Fence & Deck, our workmanship is backed, materials carry manufacturer warranties, and the specific terms are reviewed with you on the estimate. Owner Jack Johnson attends every consultation and build and does the final walkthrough himself.
Estimates are free and written. Request yours or call (214) 755-8100, and bring this checklist to the meeting.
How Park Cities Fence & Deck helps
Jack Johnson comes out himself, looks at your property and gives you a free written estimate with a timeline. Wood, iron and masonry are all built in-house, so the advice fits the property. Related services: wood fencing, iron / metal fencing, gates & gate motors. We work in Dallas and University Park and across Dallas.
Questions people ask next
Is a written contract required for a fence in Texas?
We are not giving legal advice, but you should insist on one regardless of what the law requires. The Federal Trade Commission recommends a written contract that includes the contractor’s name and contact details, estimated start and completion dates, and every promise that was made verbally. A handshake leaves you nothing to point to if the work differs from what was discussed.
How much deposit is normal for a fence?
It varies with the materials. Custom iron, masonry and gate operators involve larger orders up front than a standard cedar fence. What matters is the principle the FTC gives: do not pay the full amount before work starts, tie payments to progress, and hold the final payment until the job is finished and you are satisfied.
Why are two quotes for the same fence so far apart?
Usually because they are not the same fence. Post material and depth, picket thickness, board-on-board versus side-by-side, cap and trim, the number of gates, haul-off and permit handling all move the total. Ask each company to write those items into the quote, then compare. A large gap often closes or explains itself.
Should the quote include removing my old fence?
It should say so one way or the other. Tear-out, digging out or cutting old concrete footings, and hauling everything away are real labor. If the quote is silent, assume it is not included and ask. Also ask what happens to a neighbor’s attached fence or shared posts along the line.
What proof of insurance should I ask a fence contractor for?
Ask for a current certificate of insurance and read the dates. The FTC advises considering only contractors who are insured and asking for proof. It protects you if a worker is hurt or property is damaged during the build. Park Cities Fence & Deck is insured and provides documentation with the estimate on request.
Sources and further reading
- Federal Trade Commission: How To Avoid a Home Improvement Scam
- Railroad Commission of Texas: Pipeline Damage Prevention Program (811 before digging)
General information, not legal advice. Rules change: we confirm the current requirements with your city or HOA before we build.